Historic Prayagraj Building Undergoes Rs 27 Crore Restoration
A 150-year-old Municipal Corporation Office building in Prayagraj, Uttar Pradesh, is receiving a Rs 27 crore makeover to preserve its heritage significance. Initially set for demolition, the building was saved by recommendations from the ASI and IIT Bombay. The restoration will be completed by December 2024, ahead of the Mahakumbh 2025.
- Country:
- India
A 150-year-old Municipal Corporation Office building, which also served as the first hotel in Uttar Pradesh's Prayagraj, is undergoing a Rs 27 crore makeover.
Scheduled for completion by December 2024, the building will be showcased as a heritage site during the Mahakumbh in early 2025. The idea to preserve the structure came after consultations between the Archaeological Survey of India (ASI) and IIT Bombay.
The restoration project, led by Savani Heritage, Mumbai, uses traditional materials to ensure the building's historical character is retained. The Municipal Commissioner believes the renovated building will attract numerous visitors during the Mahakumbh.
(With inputs from agencies.)
ALSO READ
Unprecedented Gathering: Mahakumbh 2025 and Unmatched Preparations
MCEL Launches Religious Tourism Division for Mahakumbh Mela 2025
Prayagraj Gears Up for Mahakumbh 2025 with Advanced Wastewater Treatment
Spiritual Journeys and Infrastructure Revamps Gear Up for Mahakumbh Mela 2025
Uniting the Ganga: Engineering Marvel for Mahakumbh 2025